3401. A Method to Develop a Margin Plan

Publication TypeConference Paper
AuthorsSchuster, A.
Year of Publication2007
Paper Number3401
Conference66th Annual Conference, Madrid, Spain
Conference LocationMadrid, Spain
Paper Category28. WEIGHT REDUCTION - PROCESSES
Pages8
Date Published5/28/2007
Price$7.00
Order this PaperClick Here
Key Words28. WEIGHT REDUCTION - PROCESSES
AbstractThere are only four ways to reduce the weight of a system during the design/build cycle. The traditional methods address deleting things that are not required, substituting new materials to meet the requirements, and reconfiguring the system to be more effective in meeting the requirements. A fourth method is to reduce the uncertainty of the weight estimate by understanding how well the allocated solution meets the requirements. The definition of this uncertainty takes time and cannot be done all at once. So a plan is needed to assure that the uncertainty is addressed in a timely manner. This paper will address how to develop such a plan and how to integrate the plan with weight control plan and risk management plan of the project.